Wuhan Rising Electric Co., Ltd.

Manufacturer from China
Active Member
6 Years
Home / Products / Transformer Testing Equipment /

8kg Transformer Testing Equipment , Transformation Ratio Tester

Contact Now
Wuhan Rising Electric Co., Ltd.
City:wuhan
Province/State:hubei
Country/Region:china
Contact Person:MrJason
Contact Now

8kg Transformer Testing Equipment , Transformation Ratio Tester

Ask Latest Price
Brand Name :RISING
Model Number :RSBC-III
Certification :ISO CE
Place of Origin :China
MOQ :1 SET
Payment Terms :L/C, L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability :500 SET PER Month
Packaging Details :Wooden package
Measurement range :1—10000
Group :1-12 points
Accuracy :Grade 1-10000.2 class; 1000-100000.5 class
Power supply :AC220V±10%,50Hz
Temperature :-5C~40C
Relative humidity :<85%
Volume :430×320×215mm3
Weight :8kg
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

RSBC-III Transformer Testing Equipment

Multi - functional Transformation Ratio Tester

Product Description

Multifunctional Transformer Transformation Ratio & Group Tester can be used to test three-phase transformers of the power electric system, especially suitable for the testing of Z type winding transformer and rectifier transformer, as well as the Scott, inverse Scott and balancing transformers in the railway electrical system. Using a big LCD for display, menu and character printout, the tester has a friendly human-computer interface, fully functional and easy operation, being an ideal transformer transformation ratio, group and polarity tester for the power system, transformer manufacturers and railway electrical system.

Feature/Function

1. Automatically measure the wiring group.

2. Automatically change the group.

3. Automatically switch the phase sequence.

4. Automatically switch the range.

5. Automatically calibrate the meter.

6. Able to automatically calculate the relative error after entry of the standard transformation ratio.

7. Automatically cut off the test voltage after completion of a measurement.

8. Automatically save the setting data and measurement results, and provide past data for viewing.

9. The primary transformation ratio is required to be entered for only one time during measurement of the on-load transformer.

Inquiry Cart 0