Wuhan Rising Electric Co., Ltd.

Manufacturer from China
Active Member
6 Years
Home / Products / Transformer Testing Equipment /

18 Seconds Turn Ratio Transformer Testing Equipment

Contact Now
Wuhan Rising Electric Co., Ltd.
City:wuhan
Province/State:hubei
Country/Region:china
Contact Person:MrJason
Contact Now

18 Seconds Turn Ratio Transformer Testing Equipment

Ask Latest Price
Brand Name :RISING
Model Number :RSBC
Certification :ISO CE
Place of Origin :China
MOQ :1 SET
Payment Terms :L/C, L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability :500 SET PER Month
Packaging Details :Wooden package
Test Range :0.9~10000
Resolution :Min 0.0001
Working Power :AC220V±10% 50±1Hz
Ambient Temperature :-10℃~40℃
Warrenty :1 Year
Weight :12kg
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

RSBC Portable Transformer Turn Ratio Meter Turns Ratio TTR Test Equipment

Product Description

Transformer Ratio Tester is specially designed for three-phase transformer in power system, especially for transformer of type Z winding and other transformers whose zero-load current is relatively high. The tester has wide testing range, fast testing speed, favorable repeatability, flexible data processing, convenient connection, complete protection, easy learning and convenient operation.

Technical Parameters
1.Applicable to transformers connected in Z type.
2.Two output voltages are optional and applicable to transformer whose zero-load current is relatively high.
3.Have wide testing range and the highest transformation ratio may reach 10000.
4.Automatically calculate tap position.
5.Fast speed, which is only 18 seconds for three-phase.
6.Favorable repeatability.
7.Automatically save 99 data at most.
8.Flexible data processing, including retrieval, print, transfer to U-disk, delete and upload to PC computer for testing.
9.Have transformer short-circuit protection and interturn short-circuit protection functions. In case of short circuit, relevant information will be displayed on the LCD screen in characters.
10.The upper computer could control the whole testing process, save data.
Inquiry Cart 0